A structured technical audit, complete knowledge transfer, and production-readiness uplift for the Tech2Go field service platform — covering all three portals, VMS integration, and infrastructure.
What we're taking over, why a structured audit matters, and what success looks like.
Each surface serves a distinct user persona and must be independently understood, documented, and supported.
The platform runs on Digital Ocean with separate test and production deployments. The backend exposes a shared REST API consumed by all three portals.
Past incidents include database query lock-ups that brought down the full API — indicating the need for DB-level monitoring and query performance baselines as part of the audit.
Multiple enterprise customers rely on Vending Management System (VMS) integrations — used to manage machine inventory, restock scheduling, and real-time stock level tracking at each site. The audit must map all active VMS integrations, the data flow, and per-customer configuration.
Each VMS vendor has different API models and access patterns. Understanding this layer is a Day 1 priority for the audit.
Six structured audit areas — each producing documented output that feeds the KT and ongoing support readiness.
Available for both the Audit phase and the ongoing Retainer. Both configurations include Eddy as Product Manager and 24/7 support post-audit.
Team dedicated to executing the Audit & KT engagement. Costs based on $20/hr · 8hr/day. Choose based on audit pace and timeline.
Faster audit — 20 working days. Two engineers run in parallel, covering codebase and infra simultaneously. Higher weekly spend, shorter calendar time.
Relaxed pace — 40 working days. One engineer runs sequentially, fitting around the Tech2Go team's schedule. Lower weekly spend, but longer duration means higher total.
A successful KT requires active participation from key stakeholders on the Tech2Go side. The following roles should be available during the audit period:
We will prepare a structured list of technical questions in advance of each KT session to minimise the time burden on the Tech2Go team.
Structured across 20 working days. Documented deliverables at each stage. Minimal disruption to the Tech2Go operational team.
Every deliverable is a working document — not a deck. Designed to live in your team's wiki and be used operationally.
Two pace options — same scope, same deliverables. Choose based on the Tech2Go team's availability.
Audit runs first. Development work streams begin post-audit and continue as an ongoing engagement.
Once the audit is complete, Global Nodes AI and the Tech2Go team will align on the transition plan, support model, development priorities, and team configuration — before any ongoing engagement begins.